Sunday, February 27, 2011

Project Bergmann - FINAL

Project Bergmann in Santa Clara was a complete guest bathroom remodel. We demolished down to the studs for this project in order to implement a true floor-to-ceiling upgrade. We upgraded the electric panel to a 200 amp panel in order to provide circuits to the bathroom, garage, and planning ahead for future projects. We installed a new water heater and new copper pipe to bathroom. The remodel was designed by Timothy Knudsen. All materials were hand selected and purchased by Timothy, who completed the custom tile work himself for the tub surround and bathroom floor. The finished result looks and feels amazing.

Monday, February 21, 2011

Project Setti - BEFORE/AFTER

Project Setti was a very enjoyable project in Morgan Hill, CA with tremendous transformation. We were contacted to open up the living space that was situated between the Family room, Dining Room, and Living Room. We suggested to the client that we match the similiar architecture elements that were already existing within the house. This included building one large archway that created a major gateway to all the connected rooms. We relocated the electrical and audio system accordingly and installed new recessed lights and ceiling fan in the Family Room. We also painted the walls, ceilings, and archway in all affected rooms. Lastly, we removed the existing carpet and installed pre-finished distressed engineered flooring over the existing slab, which helped seal the new cozy space even further. Below are some photos:

BEFORE:
AFTER:BEFORE:AFTER:

Monday, February 7, 2011

Project Newman

Project Newman was a for a client in the heart of Willow Glen who was looking for a complete floor to ceiling kitchen remodel. We worked together for several weeks to plan the detailed renovation prior to breaking ground. This required the involvement of a structural engineer to strategically remove a wall in the kitchen that supported the second floor of the home. It was crucial that this particular wall be removed in order to significantly open up the space. The final design included architectural elements on the ceiling, reframing another wall to accommodate new custom bay window above sink, and also custom tile design work for the backsplash. For a final touch, we repainted the dining room that is adjacent to the kitchen.

Below are a series of before/after photos of this amazing project.



Saturday, January 29, 2011

Project Keng - FINAL

We recently wrapped up a project for a client in San Jose who found us on Yelp while searching for a general contractor with great reviews. She was looking to have her hall closets converted to a fully functional laundry area. We completed the following for her:

- Removed in-wall furnace
- Rerouted dryer vent
- Rerouted water and drain pipes
- Installed in-wall box with water hammers
- Custom cabinetry
- Installed appliances

Below are the before, progress, and final photos of the newly organized and functional space. Contact us today if you are interested in having us create and/or convert a similiar space for you.


Project Updates for Jan/Feb 2011

We hit the ground running at the turn of the New Year! The month of January was extremely productive and is nearly behind us. We are currently working on the following projects throughout the South Bay and gearing for more:

- PROJECT NEWMAN (Willow Glen):
Recently passed final inspections for new kitchen.

- PROJECT POLLOCK (South San Jose):
Guest bathroom remodel to be wrapped up within 2 weeks.

- PROJECT WEAVER (Sunnyvale):
Master bathroom remodel to be wrapped up within 2 weeks.

- PROJECT WILLIAMS (Campbell):
Master bathroom remodel to be wrapped up within 2 weeks.

Thank you for checking back with us in the next few weeks for the final photos on all of the above projects. We are excited to share each of them with you upon completion.

Sunday, December 12, 2010

Project Newman

On November 1, 2010, we started a kitchen remodel in Willow Glen known as Project Newman. This project has entailed floor to ceiling renovations, wall removal, and structural beam installation to support the 2nd floor above the kitchen. The remodel will be complete in the next few weeks. Here are a few before and progress photos.


Thursday, June 10, 2010

And Summer Begins...

We have been non-stop productive in many areas, on many projects. This week in particular has brought us closer to wrapping up a few projects and beginning a new major remodel.

Project Brossmer in Santa Cruz will be completed tomorrow. This project included a custom slate shower outdoors. Our client requested an outdoor shower for easy clean up after surfing the waves. We were happy to deliver and complete the project on time.

Project Jacksich in the Cambrian area of San Jose is nearly complete. We finished installing the tile in the bathroom and will be completely wrapped up next week.

Project Ferrari, also in the Cambrian area of San Jose, is well underway. We completed the service panel upgrade this week, along with the plumbing for both the kitchen and adjacent laundry room. Recessed lighting in is progress today.

Photos for all of the above will be posted next week, along with more photos for Project Bergman, Project Denham, and Project Penhardt. Thank you for checking back with us and enjoy these sunny days!